The Hotel Maximilian in Vienna-Hietzing welcomes its guests with a skilful mixture of tradition and modernity. The 4-star hotel is located only a few minutes' walk from the world-famous Schönbrunn Palace. HAINZL equipped this exclusive hotel with the appropriate building technology in the course of the complete renovation.
Our scope of services during the construction included the complete low voltage distribution, the high and low voltage installations, the LAN cabling (network technology), the entire general lighting, the emergency lighting, the installation of a fully automatic fire alarm system, a public address system, the building automation, as well as the complete grounding and lightning protection system.
Due to the high competence and reliability of our implementation team, this project was completed on time and to the complete satisfaction of our client, the Hübner Hotel Betriebe KG.
Execution period: 12.2019 - 08.2020
Order volume: approx. EUR 750.000,- excl. VAT
Further projects of the business unit building services engineering can be found here.
Within the old walls of the heritage-protected building at the Hauptplatz in Linz, the Motel One Group opened a stylish design hotel with 111 contemporary rooms. For HAINZL Gebäudetechnik, the special challenge of this project was its special mix of historical and modern elements.
HAINZL building technology supplied the complete low-voltage distribution system, a communication system, LAN cabling, a video surveillance system and a sound system. Our contract also included the supply and installation of the lighting, the installation of a fire alarm system and emergency lighting as well as all earthing and lightning protection measures.
Construction period: 05.2018 - 12.2019
Order volume: EUR 1,175,000.00 excl. VAT
Further projects of the business unit building services engineering can be found here.
Service period: 2014 - 2015
Order volume: EUR 1.200.000,-
Scope of services:
|
|
|
|
|
|
|
|
|
|
|
|
In 2019 the 4th and 5th floors of the main building were completely gutted and architecturally rebuilt. Additional rooms were created, which are equipped with the latest technology. As with the general modernisation in 2010/2011, the owner confided the installation of the entire electrical engineering to HAINZL Building Technology.
Specifically, this included the complete low voltage distribution, the high and low voltage installations, the LAN cabling (network technology), a fire alarm system as well as the entire lighting including emergency lighting.
Execution period: 01.2019 - 01.2020
Order volume: EUR 1,350,000 excluding VAT
Further projects of the business unit building services engineering can be found here