Lategothic church Oberneukirchen, Upper Austria Drucken

In 2019 started the complete redesign of the interior of the lategothic church Oberneukirchen (Upper Austria) from the 15th century. The general renovation included, among other things, the renewal of the floor, renovation of the organ, rear ventilation of the windows, installation of a new bench heating system based on infrared, renewal of the electrical installations, lighting and loudspeaker system, restoration of the church pews up to the redesign of the sanctuary.

HAINZL installed the entire electrical engineering in the building complex with modern and new technology. Specifically, this included the complete low voltage distribution, the high and low voltage installations, the LAN cabling (network technology), the entire lighting cabling and, as a highlight, a multifunctional control panel (see picture) for optimum control of the lighting system, the heating, the sound system, as well as the bell and window control.

Execution period: 06.2019 - 03.2020

Find out more about this project >>

Kepler Hall at the JKU, Linz Drucken

In March, another outstanding new building at the Johannes Kepler University (JKU) Linz will open its doors - the so-called "Kepler Hall", the new entrance to the entire university campus. The multifunctional building with a total gross floor area of around 3,000 m² is designed as an assembly hall as well as an event center and offers space for receptions, cultural and sporting events or individual meet-ups. The aim of developing and revitalizing the entire university campus is to position JKU at the top in the competition with European universities. HAINZL also implemented this great project electrotechnically.

Our scope of services included the complete electrical installation including low voltage distribution, LAN cabling (network technology), the installation of all safety systems such as fire alarm system, smoke aspiration system, safety lighting, a complex lighting system and the lightning protection system.

Execution period: 06.2019 - 02.2020
Order volume: EUR 920,000 excluding VAT

 

Library building of the Johannes Kepler University, Linz Drucken

The Johannes Kepler University (JKU) Linz wants to catch up with European universities and is therefore investing equally in academic excellence and campus development. The library building was recently upgraded in an ambitious functional and architectural manner. On the one hand, the new Learning Center offers students about 300 workplaces in three learning zones. And in terms of architecture, JKU excels among other things with the new "Spanish Steps". The entire electrical engineering for this project was installed by HAINZL.

Our scope of services included the complete electrical installation, including the low voltage distribution, the LAN cabling (network technology), the installation of all safety-related systems such as the fire alarm system, safety lighting, a complex lighting system and the lightning protection system.

Execution period: 05.2019 - 02.2020
Order volume: EUR 700,000 excl. VAT

Find out more about this project >>

Park Hotel Schönbrunn, Vienna Drucken

In 2019 the 4th and 5th floors of the main building were completely gutted and architecturally rebuilt. Additional rooms were created, which are equipped with the latest technology. As with the general modernisation in 2010/2011, the owner confided the installation of the entire electrical engineering to HAINZL Building Technology.

Specifically, this included the complete low voltage distribution, the high and low voltage installations, the LAN cabling (network technology), a fire alarm system as well as the entire lighting including emergency lighting.

Execution period: 01.2019 - 01.2020
Order volume: EUR 1,350,000 excluding VAT


Find out more about this project >>

Hotel One, Main square Linz Drucken

Within the old walls of the heritage-protected building at the Hauptplatz in Linz, the Motel One Group opened a stylish design hotel with 111 contemporary rooms. For HAINZL Gebäudetechnik, the special challenge of this project was its special mix of historical and modern elements.

HAINZL building technology supplied the complete low-voltage distribution system, a communication system, LAN cabling, a video surveillance system and a sound system. Our contract also included the supply and installation of the lighting, the installation of a fire alarm system and emergency lighting as well as all earthing and lightning protection measures.

Construction period: 05.2018 - 12.2019
Order volume: EUR 1,175,000.00 excl. VAT