Rotating union for parallel supply of test and set-up station of an end-of-line test bench The 4-fold rotary union enables the test and set-up station to be supplied with test oil at the same time. The position of the rotating union in...
Cylinder for pan turret HAINZL Systemtechnik has developed a 16-ton cylinder for its customer Primetals Technologies. The heavyweight is used to lift ladles on the ladle...
Rotary union for expanding cylinder Coilers" are used to roll up the steel coils. The coils are picked up with the expanding mandrel. For this purpose, we supply the expanding...
Development test bench for hydrogen sensors This development test bench is used to develop sensors for a wide range of hydrogen applications. It automatically generates precisely...
Burst pressure test stand for type 4 hydrogen tanks This test stand is used for burst pressure testing of type 4 hydrogen tanks. The test chamber must withstand enormous loads during the burst test....
Development test bench for hydrogen valves in the automotive industry This test bench is used for the development of proportional pressure and shut-off valves for hydrogen fuel systems. It is tested up to a nominal...
Test bench for adaptive shock absorbers in the automotive sector This end-of-line test bench records the characteristic data of the adaptive shock absorbers via volume flow and differential pressure and thus...
Lowerable pool ground with HAINZL water hydraulics Together with the customer "Delfin Wellness" HAINZL Systemtechnik has developed the "Secret Pool". The lifting floor, which can be lowered thanks...
Universal test stand for hydraulic components For testing a wide range of different cylinders and valves, HAINZL has developed a universal test stand that enables a broad test scope: function...
Test line for proportional valves This end-of-line test stand ensures the quality assurance of proportional valves before delivery. In total, HAINZL manufactures three test lines...
Revamping Ottensheim power plant - rebuilding the turbines The Ottensheim/Wilhering power plant was commissioned in 1974 and has been regularly maintained and partially refurbished. Since 2020, the power...
Revamping weir cylinder Ottensheim power station The Ottensheim/Wilhering power plant was commissioned in 1974 and regularly maintained and partially refurbished. After about 25 years, the...