References Buildings Technology

Habau-Group, Linz Drucken

The HABAU Group relied on HAINZL's expertise to implement the building services projects for its new Linz location. The new, four-story Linz location HAB25 on Franzosenhausweg impresses with ultra-modern and flexible office space, spacious meeting and training rooms, as well as its own gym and a large green roof terrace.

HAINZL scored in this modern architecturally striking office building with 8,200 m² of usable floor space primarily with sophisticated visual installation. The scope of services provided by HAINZL Gebäudetechnik included, among other things, the complete low-voltage distribution, high-voltage and low-voltage cabling, LAN cabling (network technology), delivery and installation of all lighting, emergency lighting, the installation of a fully automatic fire alarm system, as well as extensive building automation. In addition, HAINZL Gebäudetechnik was responsible for the installation of the required e-mobility in the form of e-charging stations, as well as the cabling work for the access control, alarm system and extensive MSR systems.

Execution period: 11.2020 - 07.2022
Contract volume: EUR 1,800,000 excl. VAT.

Learn more about this project here.

Held&Francke, Vienna-Strebersdorf Drucken

Recently, a 3-story, architecturally sophisticated office and operations building of the construction company Held&Francke as well as a 5-story crew quarters for about 90 employees went into operation in Vienna-Strebersdorf. HAINZL is responsible for the electrotechnical equipment at the new location and scores again with the precise planning for the sophisticated installation in exposed concrete. Our high level of planning competence and seamless, cooperative partnership with the other trades was once again demonstrated in this project.

The scope of services provided by HAINZL Gebäudetechnik included, among other things, the complete low-voltage distribution, high-voltage and low-voltage cabling, LAN cabling (network technology), delivery and installation of all lighting, emergency lighting and the installation of a fire alarm system, as well as the complete grounding and lightning protection system.

Execution period: 04.2021 - 08.2022
Contract volume: approx. EUR 1,100,000 excl. VAT.


Learn more about this project here.

Police Headquarters, Linz Drucken

The new police headquarters in Gruberstraße is a state-wide showcase project - from April 2023, all police work in Upper Austria will be coordinated from there. HAINZL Gebäudetechnik proved its expertise in the impressive technical design and media technology of the building.

Our scope of services included the low-voltage main distribution, the lighting technology including emergency and safety lighting, a UPS and fire alarm system, the intercom system, the network cabling as well as the clock system and the cabling of the media technology. In addition, HAINZL Gebäudetechnik was responsible for the KNX BUS system, the public address system for evacuations, the emergency power generator, the lightning protection system and the e-charging stations.

Contract period: June 2020 - December 2022
Contract volume: EUR 1,420,000.00

Further projects of the Building Services business unit can be found here.

KPMG office building, Vienna Drucken

KPMG Austria is one of HAINZL Gebäudetechnik's long-standing customers in the field of service and maintenance. For the office location in Vienna's Porzellangasse, which was acquired in 2006 and expanded as of 2021, KPMG once again relied on HAINZL's proven expertise.

The 14,000 m² office building was expanded from 2021: expansion of the attic floors, construction of an underground parking garage as well as an addition. Our scope of services for the project included the low-voltage distribution systems, the high-voltage and low-voltage installations, the emergency and safety lighting, the grounding and lightning protection systems, and the IT cabling. We were also responsible for the cabling of the media technology, for the lighting control of the open space and for the MSR cabling as well as for the data technology. 

Contract period: November 2021 - March 2023

You can find more projects of the building services engineering business unit here.

Free City, Freistadt Drucken

Sustainability that is second to none: The company headquarters of the clean-tech company neoom, in the Free City building in Freistadt, was built in record time and entirely from recyclable materials. The many years of experience of HAINZL Gebäudetechnik employees also played a major role in this project.

The scope of services provided by HAINZL Gebäudetechnik included low-voltage distribution, all high-voltage and low-voltage installations as well as the installation, assembly and connection of the lighting technology. Furthermore, we were responsible for the emergency and safety lighting, the I&C cabling, the EDP cabling, the data technology and for the installation of the grounding and lightning protection system. The execution and planning of the fire alarm system as well as the building automation including access control complete our scope of services.

Execution period: 07.2022 - 02.2023 
Contract volume: approx. EUR 1.350.000,-.

Further details about this project can be found here.