Sports Secondary School Kleinmünchen, Upper Austria Drucken

Kleinmünchen Sports Middle School, Upper Austria

The Kleinmünchen Sports Middle School and its sports talents now shine in new light. HAINZL provided perfect electrical, lighting and media technology for the general renovation of the young athletes' forge. HAINZL is particularly proud of the 1000 lux lighting system as well as the installed sound and media technology in the new ball sports hall.

HAINZL Gebäudetechnik was also responsible for the installation of the complete low-voltage distribution system, for all heavy and light current installations, for the LAN cabling and for the installation of the clock system. In addition, safety was ensured with the installation of the fully automatic fire alarm system including smoke aspiration system, the installation of emergency lighting and the erection of the complete grounding and lightning protection system. The conversion was carried out during ongoing operations.

Execution period: March 2021 - December 2022
Contract volume: EUR 2,700,000.00


Learn more about this project here

Machinery manufacturer GÖWEIL, Upper Austria Drucken

The Austrian agricultural machinery manufacturer GÖWEIL from Kirchschlag/Linz is expanding and built a second production site in Rainbach im Mühlkreis. A complex for up to 150 modern workplaces consisting of a paint shop, an assembly hall and a shipping hall with a total area of 15,500 square meters was built on the 4.3-hectare site. In addition to offices and recreation rooms, the 2,100-square-meter social building also houses a company canteen.

GÖWEIL invested a total of 27 million euros in the new plant.

Our scope of services included, among others, the complete low-voltage distribution, high-voltage and low-voltage cabling, the LAN cabling (network technology), delivery and installation of all lighting, emergency lighting and the installation of a fire alarm system. HAINZL Building Technology was also responsible for the cabling work for an access control system, a sprinkler system, as well as the very extensive cabling of the MSR and the machine systems, some of which were provided by the customer.

Execution period: 11.2020 - 10.2021

Further projects of the business unit building services engineering can be found here.

Techbase Linz, Upper Austria Drucken

Techbase Linz is one of the largest Linz building projects of the next few years and, as a innovation and technology hotbed, is intended as a place for modern and already established companies in the field of cutting-edge technology, but also to provide space for young companies in this segment to develop and grow. The project will be built in 2 construction stages, to be completed in 2022 and 2024.

HAINZL Building Technology was able to acquire the third and by far the largest contract from the client Neuson Real GmbH after the projects at the Linz Winterhafen and the 25er Turm. 

The fact that HAINZL was finally awarded the complete electrical engineering contract is primarily due to the first-class performance of the excellent handling and installation teams in the previous projects with this client.

Further projects of the business unit building services engineering can be found here.

Oberbank, Linz Drucken

HAINZL modernises security technology at Oberbank headquarters. After approximately one year of renovation and modernisation of the electrical systems in the Oberbank headquarters on Untere Donaulände in Linz, HAINZL Building Technology was able to successfully complete the project.

Among other things, the emergency and safety lighting in the existing building was adapted. Furthermore, the installation of a new siren system including the necessary cabling was carried out, as well as the delivery and installation of an additional parallel diesel emergency power system. HAINZL renewed the entire system during ongoing operations and is pleased that the project was completed on time despite the restrictions imposed by COVID-19.

Execution period: 10.2019 - 12.2020
Order volume: approx. EUR 1,000,000,- excl. VAT


Further projects of the business unit building services engineering can be found here.

Hermann - Neuburger Fleischlos, Upper Austria Drucken

With the trademark HERMANN the company Neuburger Fleischlos in Ulrichsberg offers a Premium alternative to meat and is thereby pioneer in the production of meatless dishes out of mushrooms. Due to the high demand for HERMANN products, the 2nd expansion stage of the 35 mushroom culture halls and the production hall was successfully completed in September 2020. HAINZL installed the finest electrical engineering. 

In this project the high technical requirements as well as the hygiene regulations of the food industry posed special challenges.

The scope of services of HAINZL Building Technology included the complete low voltage distribution, heavy and light current cabling, LAN cabling (network technology), delivery and installation of the entire lighting, emergency lighting and the installation of a fire alarm system. HAINZL Building Technology was also responsible for the cabling of the access control, an alarm and video system, as well as the very extensive cabling of the MSR and the machine systems, some of which were provided by the customer.

Execution period: 01.2019 - 09.2020
Order volume: EUR 2.500.000,- excl. VAT